1 - i have been told that free standing ground level decks do not need cement footings below the frost line,is this correct? 2 - another problem is that i n eed the deck to be free standing (not attached to house) but there is a cement sidewalk the entire length of the back of the house that butts against the slab, Free Sample

there is no frost line since this is a freestanding deck. use tube forms to level the footings about 1 inch above ground level. approximate time for a novice (with a helper) to lay out footing locations, dig holes and level tube forms for this deck: 5-7 hours. 2. pour concrete and place post anchors. pour concrete post anchors, Free Sample

rona carries supplies for your build a one-level deck projects. it is the ultimate do-it-yourself job because building a 12' x 12' one-level deck or patio can be achieved in one weekend by just following a simple set of , the height of the deck's surface above the ground determines the requirement for the railing height. Free Sample

i am planning on building a free standing deck (34' across x 16' deep), with an added gazebo (10' … ideas for a ground level deck. i would like to build a ground level deck using 2 x 6's to achieve a low height without a massive step up, the grade drops aprox 1' in the rear. i … low profile deck questions i just got stationed, Free Sample

tip to ensure the deck ends up perfectly flat and level, plane off any high spots on the joists and bearers once the framework is assembled. decking materials. this small decking platform is made using 90 x 90mm h3 treated pine for the posts, with the h3 rating meaning it can be concreted directly into the ground. Free Sample